Preparation and surface protection
Cabin of industrial blasting and application of epoxy paint for the protection of metal surfaces.
Infrastructure and equipment intended for industrial prefabrication of pipes and spools, with areas and technical resources for specialized jobs in the manufacturing, preparation, treatment, and verification.
Industrial warehouse with crane, welding positioners TIG/MIG, bevelling orbital and rotary machines.
Cabin blasting, application of epoxy paint and equipment for the heat treatment of relief of tension post-weld (PWHT).
Area for tests hydrostatic and pneumatic loggers digital pressure.
The equipment of the workshop includes processes of preparation, treatment and testing of industrial components, in accordance with the characteristics of the work and the technical requirements established.
Cabin of industrial blasting and application of epoxy paint for the protection of metal surfaces.
Equipment for the relief of tension post-welding, in accordance with the requirements applicable to the work.
Area for tests hydrostatic and pneumatic loggers digital pressure.
The procedures and controls are determined in accordance with the scope of work and technical requirements.
Infrastructure and industrial equipmentSpecialised equipment for jobs of intervention, machining and adjustment of industrial components.
Torque wrenches hydraulic low profile/quadrant and tensioners multipasados of bolts.
Units of pumping high-pressure air, with capacity indicated in the document of up to 15,000 PSI.
Portable machines for machining and facing of flanges, in addition to drilling equipment hot-gas pipeline.
Instrumental calibration, alignment and laser detectors, according to the inventory documented.
The verification technique allows to evaluate the results of the work in accordance with the requirements established for each intervention. The scope of the evidence and the controls depends on the conditions of the project.
Check by tests with fluid in accordance with the procedure and the criteria applicable to the assessed component.
Tests with pressure gaseous according to the extent authorized and the security conditions are appropriate.
Use of data loggers digital pressure and measuring instruments referred to in the equipment documentation.
The tests are performed only when they occur in the scope of the work and in accordance with the procedures, technical requirements and safety conditions applicable. The availability and validity of the equipment should be confirmed with the company.
Get to know our infrastructure and specialized equipment for industrial work of prefabrication, treatment and testing of components.
Comprehensive solutions for maintenance and mechanical services for operators and global EPC projects
In Partnership Petro & Gas we boost the performance of your company with industrial services of first level. We provide preventive and corrective maintenance, supply of parts, and personalized attention to meet the operational needs of the industry. We minimize failure is not programmed to maintain the productivity of your equipment at the highest level. We are your strategic partner to prolong the life of your machine and ensure a reliable operation day after day.




©2026 Alliance Petro Gas – All rights reserved / site created by MegaWeb